Home / Operators / Bollinger Canyon Road BR 1-X Solar Project 2020
Bollinger Canyon Road BR 1-X Solar Project 2020
Electric power plant operator — U.S. Energy Information Administration (Forms EIA-860/860M).
Power plants
1
Total nameplate capacity
1.4 MW
States
1
Generators
3
Capacity by technology
Solar Photovoltaic · 1 plant1.4 MW
| Plant | State | Technology | Capacity |
|---|---|---|---|
| Bishop Ranch BR 1-X | CA | Solar Photovoltaic | 1.4 MW |
Source: U.S. Energy Information Administration, Forms EIA-860/EIA-860M — currently operating generators, aggregated to plant then to operator.